Friday, October 10, 2014


This week A. Lamp Concrete Contractors continued excavation for the pavement widening on Greenwood Road and sidewalk on West Lake Avenue and for driveways on West Lake Avenue and Greenwood Road.  A. Lamp also continued framing for the concrete bike path to be installed on the south side of West Lake Avenue and a few other minor locations.  The electrical subcontractor was also onsite this week installing concrete structures required for the traffic signal installation.

Next week A. Lamp Concrete Contractors is scheduled to complete the majority of the sidewalk and bike path with a few gaps in some locations for utility conflicts.  A. Lamp is also scheduled to install asphalt driveways on Saturday of this week and Monday of next week.  The asphalt subcontractor is scheduled to be onsite mid-week to install the asphalt pavement widening on Greenwood Road.  Additionally, the electrical subcontractor is scheduled to be onsite installing the remaining concrete structures and detector loops in the pavement required for the traffic signals and begin re-installation of the street lighting on West Lake Avenue from Pickwick Lane to North Lake Terrace and the two streetlights that were removed east of Pfingsten Road on West Lake Avenue.